CPT Testing Along a Quay

Gouda CPT truck positioned next to a quay during geotechnical site investigation by Koops Grondmechanica.

Some site investigation projects require more than a standard equipment setup. An example from the Gouda Geo-Equipment archives shows how careful positioning and the right machine capabilities can make a difference when working in challenging conditions.

During a project involving CPT testing near a quay, Koops Grondmechanica BV faced a particular challenge. The required test location was close to the water’s edge, where positioning the CPT truck parallel to the quay could have placed the machine on less stable ground, increasing the risk of tipping.

A Different Approach to CPT Positioning

The situation called for an alternative setup that would allow the operator to reach the required test location while maintaining stability.

Using a Gouda-built CPT truck equipped with remote controls, the operator was able to manoeuvre the machine into a suitable position for the investigation.

The project demonstrates the importance of considering ground conditions, machine stability and accessibility when planning CPT operations.

Practical Engineering for Challenging Conditions

At Gouda Geo, we understand that site investigation rarely takes place under ideal conditions. Restricted access, difficult terrain and limited working space can all influence how CPT equipment needs to be deployed.

This example from Koops Grondmechanica illustrates how practical machine design and experienced operators work together to address challenging field conditions.

Because reliable CPT testing is not only about collecting accurate data. It also starts with positioning the equipment safely and effectively.

Our thanks to Koops Grondmechanica for this memorable example of CPT equipment in action.